Phase 3 of the North Bank Trail is two (2) miles long and stretches from from 112th Ave in Nunica to 96th Ave. Key features to this phase include two existing historic railroad trestles crossing over Crockery Creek. All of the land and easements for the Phase 3 are in place and construction is planned for 2020-2022.
